Tub-to-Shower Conversion in Nashville and Middle Tennessee
Bathroom and Shower Tile

Tub-to-Shower Conversion

Tub-to-shower conversion that swaps an old tub for a tiled shower or a shower with a smaller tub, with new walls, waterproofing and tile in the same footprint.

A standard five-foot tub alcove is a good size for a roomy shower. Replacing the tub with a tiled shower can happen in the same footprint, which keeps the project simpler and the bathroom layout familiar. Homeowners in Nashville choose it for safer entry, easier cleaning and a fresher look. The work behind the wall matters more than the tile, so we focus first on framing, drain placement and a properly waterproofed pan.

We remove the tub and the surrounding wall finishes, check the framing and floor, and then build a new pan and walls. Because the drain is usually at one end of the alcove, we plan the slope to suit. A low curb or a curbless design is possible depending on the floor structure. We help you choose wall tile, a niche and a floor tile that works on the slope, and we coordinate with a glass company for a door or panel. You get a written scope and a schedule before demolition begins. Before deciding, check whether another bathroom in the house has a tub. Many buyers like to see at least one tub in a home, and keeping one elsewhere makes this conversion an easy decision. If this is the only tub, we are happy to talk through the tradeoffs.

Same alcove

The tub space becomes a roomy shower.

New pan

Slope and drain built for tile.

Walls rebuilt

Backing and membrane replace the old surround.

Glass ready

Measurements shared at the right time.

What is included

  • Tub removal
  • Framing and floor check
  • New pan and walls
  • Waterproofing system
  • Wall and floor tile
  • Glass coordination
Before and after

See the transformation.

Drag the handle to compare.

After: a bathroom corner with a tiled walk-in shower with a niche, a glass panel and a mosaic floorBefore: a bathroom corner with a plastic tub-and-shower insert, a mildewed curtain and dated pink tileBeforeAfter
A grimy tub insert, then a modern tiled walk-in shower. From a plastic tub-and-shower insert, a mildewed curtain and dated pink tile to a tiled walk-in shower with a niche, a glass panel and a mosaic floor.
Why it works

What you get with Tub-to-Shower

Same footprint

Often built in the existing alcove.

Safer entry

A low curb or open entry replaces the tub wall.

New pan and walls

Built and waterproofed from scratch.

Niche and shelves

Storage built into the tile.

Glass options

Door, panel or curtain planned early.

Simple schedule

Clear steps and dates.

Try it now

Tile Project Timeline Planner

Pick the project and options to see a typical sequence from estimate and ordering to prep, setting, grout and finishing, with cure times.

How it works

Our process, start to finish.

  1. 01

    Call and describe the job

    You tell us the rooms, the tile you like and your timing, and we ask about the floors, walls and any water issues.

  2. 02

    Measure and plan

    We check flatness, moisture and layout from photos or a visit and talk through materials, pattern and trim.

  3. 03

    Review the estimate

    You get a plain written scope with prep, waterproofing, materials, schedule and cure times before anything is ordered.

  4. 04

    We prepare the surfaces

    Old tile comes out, floors are repaired and leveled, backer board and membranes go in and showers are waterproofed and tested.

  5. 05

    We set the tile

    Tile is set with the right mortar, checked for flatness and alignment and cut carefully at the edges.

  6. 06

    Grout, seal and walk through

    We grout, seal and caulk, clean up and walk the finished job with you, leaving written care tips and extra tile.

Questions

Tub-to-Shower FAQ

Can I convert a tub to a shower in the same space?

Yes, a standard tub alcove usually works well for a tiled shower.

Will I lose resale value without a tub?

Many homes keep one tub elsewhere. If this is your only tub, think about resale before you decide.

Do you replace the drain?

Usually yes, so the new pan slopes correctly. We check what is under the floor first.

How long does it take?

Often several days to two weeks, including waterproofing and cure times.

What if the walls are damaged?

We repair or replace damaged framing and backing before any tile goes on.

Next step

Get your Free Tile Estimate for Tub-to-Shower.

Tell us about your project and we will call you back to set up a visit.

Or call (615) 357-7797 to talk now.

Tell us about your project

We will call you back to talk it through and set up a visit.

Prefer to talk? Call (615) 357-7797. We never sell your information.

Call NowFree Estimate