Floor Prep and Leveling in Nashville and Middle Tennessee
Prep, Repair and Regrouting

Floor Prep and Leveling

Floor prep and leveling that makes concrete and wood subfloors flat, clean and ready for tile, using grinding, patching and self-leveling compounds.

Tile can only be as flat as the floor beneath it. Dips and humps show up as uneven grout lines, rocking tiles and cracked edges, and large tiles make every flaw obvious. Floor prep is the least glamorous part of a tile job and the most important. Homeowners in Nashville who have seen a badly prepped floor know why, and we treat prep as the foundation of the whole project.

We measure the floor with a long straightedge and mark high and low spots. High spots are ground down, low spots are filled with patching compound and larger areas can be flooded with self-leveling underlayment. We clean the surface, remove old adhesives and prime it so the new material bonds. Wood subfloors may need new plywood, screws and stiffening, and we explain what the floor needs before tile is ordered. After leveling, we recheck flatness and cure time before setting tile. Tell us what tile size you plan to install, since larger tile needs a flatter floor. Photograph any visible dips or cracks and note any doors that may need trimming. If the floor will be higher after leveling, we discuss how it meets thresholds and neighboring rooms.

Flatness measured

Straightedge checks find high and low spots.

Ground and filled

Humps removed and dips patched.

Self-leveling option

Large low areas flooded flat.

Rechecked

Flatness verified before tile.

What is included

  • Flatness measurement
  • Grinding and patching
  • Self-leveling work
  • Cleaning and priming
  • Wood subfloor review
  • Final flatness check
Before and after

See the transformation.

Drag the handle to compare.

After: an entry and living area with large-format porcelain tile with thin, even grout linesBefore: an entry and living area with scratched, dull linoleum with cracked patchesBeforeAfter
A worn linoleum floor, then large-format porcelain tile. From scratched, dull linoleum with cracked patches to large-format porcelain tile with thin, even grout lines.
Why it works

What you get with Floor Prep and Leveling

Measured flatness

Straightedge checks mark high and low spots.

Ground and filled

Humps removed and dips patched.

Self-leveling option

Large areas flooded to flat.

Clean and primed

Surface ready for bond.

Wood floors reviewed

Stiffness and fasteners checked.

Rechecked

Flatness verified before tile.

Try it now

Tile Project Timeline Planner

Pick the project and options to see a typical sequence from estimate and ordering to prep, setting, grout and finishing, with cure times.

How it works

Our process, start to finish.

  1. 01

    Call and describe the job

    You tell us the rooms, the tile you like and your timing, and we ask about the floors, walls and any water issues.

  2. 02

    Measure and plan

    We check flatness, moisture and layout from photos or a visit and talk through materials, pattern and trim.

  3. 03

    Review the estimate

    You get a plain written scope with prep, waterproofing, materials, schedule and cure times before anything is ordered.

  4. 04

    We prepare the surfaces

    Old tile comes out, floors are repaired and leveled, backer board and membranes go in and showers are waterproofed and tested.

  5. 05

    We set the tile

    Tile is set with the right mortar, checked for flatness and alignment and cut carefully at the edges.

  6. 06

    Grout, seal and walk through

    We grout, seal and caulk, clean up and walk the finished job with you, leaving written care tips and extra tile.

Questions

Floor Prep and Leveling FAQ

How flat does a floor need to be?

It depends on the tile. Large tile needs a very flat floor, often within about an eighth of an inch over ten feet.

Can you level a wood floor?

Yes, with patching, underlayment or added plywood, depending on its condition.

What is self-leveling underlayment?

A poured cement-based product that flows flat, used for larger low areas.

How long does leveling take to cure?

Often a day or so before tile, depending on the product and thickness.

Does leveling add height?

It can. We explain how finished height affects doors and adjoining floors.

Next step

Get your Free Tile Estimate for Floor Prep and Leveling.

Tell us about your project and we will call you back to set up a visit.

Or call (615) 357-7797 to talk now.

Tell us about your project

We will call you back to talk it through and set up a visit.

Prefer to talk? Call (615) 357-7797. We never sell your information.

Call NowFree Estimate