Project scheduling and a prep checklist that sets dates, clears the space and lines up materials and trades so your tile job starts smoothly.
A little preparation before the crew arrives saves days. Clear rooms, ordered materials, confirmed trades and realistic dates make the difference between a smooth job and a stalled one. Homeowners in Nashville love having a checklist, and we give one with every project, along with a schedule they can plan around.
We map the sequence: demolition, repairs, prep, waterproofing, tile, grout, sealing and fixtures, with cure times between steps. We confirm when tile and materials will arrive and when other trades are needed. The checklist covers what to move out of the room, how to protect pets and belongings, where we will stage materials and how we will manage dust and noise. We tell you honestly what could shift the schedule, such as hidden damage or special-order delays, and we update you as the job moves. Walk through the checklist a few days before the start date. Move furniture, remove wall hangings and make sure we can reach water and power. If pets or children are at home, plan where they will be, and tell us about any hours that are not workable.
Every step in order with cure times.
Plumber, electrician and glass scheduled.
What to move and protect.
You hear when anything shifts.
Every step in order with cure times.
Plumber, electrician and glass scheduled.
Delivery lined up with the start.
What to move and protect.
Barriers and quiet hours.
You hear when anything shifts.
Every topic has its own page with what to expect and how we approach it.
Comparison guideBathroom Remodel TimelineThe usual order of a bathroom remodel, from planning and demolition to waterproofing, tile, grout and fixtures, and…Learn more
Comparison guideFloor Prep and LevelingWhy tile needs a flat, clean, sound base, how flatness is checked and how leveling compounds and grinding…Learn more
Comparison guideTile Cost DriversThe main things that shape a tile quote, from area and prep to tile choice, pattern, waterproofing and…Learn more Pick the project and options to see a typical sequence from estimate and ordering to prep, setting, grout and finishing, with cure times.
You tell us the rooms, the tile you like and your timing, and we ask about the floors, walls and any water issues.
We check flatness, moisture and layout from photos or a visit and talk through materials, pattern and trim.
You get a plain written scope with prep, waterproofing, materials, schedule and cure times before anything is ordered.
Old tile comes out, floors are repaired and leveled, backer board and membranes go in and showers are waterproofed and tested.
Tile is set with the right mortar, checked for flatness and alignment and cut carefully at the edges.
We grout, seal and caulk, clean up and walk the finished job with you, leaving written care tips and extra tile.
As early as you can. Good times fill up, and special-order tile needs lead time.
Clear the room, move valuables and make sure we can reach water and power.
Yes. Hidden damage or late deliveries can shift dates, and we keep you informed.
Usually not, though noisy days may be easier elsewhere.
Floor protection, dust barriers and daily cleanup are part of our routine.
Material OrderingMaterial ordering and delivery help that calculates quantities, checks lead times and plans staging so tile, mortar and…Explore
Measure and Site VisitAn in-home measure and site visit that checks floors, walls, plumbing locations and access so your tile order…Explore
Designer and Contractor CoordinationDesigner and contractor coordination that aligns tile plans, drawings and schedules with your designer, builder and other trades…Explore
Care Guide and WalkthroughA post-install care guide and walkthrough that shows you the finished tile, explains cure times and cleaning and…Explore Tell us about your project and we will call you back to set up a visit.